This project provides for the design and construction of Phase 2 sidewalks, in the Goethe Road Neighborhood area including Goethe, Shults and Hildebrand Roads and portions of Eighth Avenue. This phase consists of sidewalks along the opposite side of the road from Phase 1 to complete pedestrian connections to schools, parks and the Historic District, while improving pedestrian safety for the neighborhood. 

5/28/19

  • This project is currently in the engineering design phase. Easement acquisition and permitting will begin in FY2020 with construction to be complete in FY2021.

9/7/18

  • This project is currently in the planning phase.  The Goethe - Shults Road Neighborhood Revitalization Plan is completed and was presented to Town Council.  Surveying and conceptual sidewalk alignment is complete for areas South of Bluffton Parkway. Final engineering design and permitting to be completed in FY 2020. Construction is also anticipated to start in FY 2020.

5/31/18

  • Town Staff is preparing a Goethe Road Neighborhood - Infrastructure Plan with assistance from LCOG prior to application for CDBG project funding. Surveying and conceptual sidewalk alignment is complete. A final draft of the Neighborhood Plan will be complete by June 30, 2018. Final engineering design and permitting to be completed in FY 2020. Construction because of funding and grant implications is subject to the adoption of the Neighborhood Plan (construction is anticipated to start in FY 2020).
ward Edwards
No contract awarded at this time.
Project Manager: Pat Rooney | 843-706-4521
prooney@townofbluffton.com
© Town of Bluffton/Website by Hazel Digital Media